ALBA GROUP 3 GARMENT COAT RAIL
Rated 5.00 out of 5 based on 3 customer ratings
🎁 Exclusive New Member Deal: Get 15% OFF Your First Order Under $60 – Use code WELCOME15 – Offer ends in
★★★★★5.0· 3 reviews
Categories: , Steel Baths, Tennisschläger, Stem Accessories, Sterilisatoren Für Nagelwerkzeuge
Description ALBA GROUP 3 GARMENT COAT RAIL Model: ALB12404 SKU:PMGROUP3 : Alba Garment Coat Rack Metal PMGROUP3 Product Overview Alba Garment Coat Rack Metal PMGROUP3This Alba Garment Coat Rack features extra hanging space for accessories with plastic hooks at either end. With great manoeuvrability on 4 roller casters and 2 brakes, this coat rail is extremely sturdy and has the capacity for 50 coat hangers on its 1420mm hanging bar, ideal for reception areas or meeting rooms. Garment rail with luggage shelf Easy to manoeuvre with 4 roller casters Sturdy design with 2 brakes Easy to assemble Capacity up to 50 hangers Hanging bar length: 1420mm Finish: Metal There may be additional delivery charges for the Highlands, islands, and Ireland (please call us for details) Product Specifications Weight kg: 10.3 Height mm: 160 Product Unit: 1 Width mm: 200 Batteries Included: No Brand: Alba Pack Unit Of Sale Barcode: 3129710012404 OEM: PMGROUP3 Depth mm: 440 Pack Contains: 1 Country of Origin: France Recycled Product: No Recyclable: No Colour: Silver
SHIPPING TIMES:
– United States:
- Standard (6 – 12 Business Days)
- Expedited (4 – 8 Business Days)
– International:
- Standard (14 – 28 Business Days)
- Expedited (7 – 14 Business Days)
SHIPPING COST:
– Standard Shipping ()
- Orders using this option generally arrive 5-10 days (U.S. orders) and it takes 2 weeks for International orders after being manufactured and shipped. (See notes below)
- Manufacturing times for this option vary more around busier times of the year or during extreme circumstances such as covid-19 shutdowns.
– Shipping and expedited manufacturing () (U.S. Only)
- Orders using this option jump to the front of the manufacturing queue which can generally save a couple days (or more during busier times of the year).
- It’s highly recommended to use this option if you are ordering for a specific event or holiday.
- Orders using this option generally arrive 2-3 days after being manufactured and shipped. (U.S. only)
- Orders using expedited manufacturing will be printed when the next batch of orders are processed which can vary depending on seasonality and other factors.
Please Note:
- We do not guarantee shipping or arrival dates.
- Manufacturing during the majority of the year takes between 1-5 business days (Mon-Fri) however can take more than a week during the heaviest shopping times of the year. Extreme circumstances such as covid-19 may delay order manufacturing and/or shipping by an additional week or more.
- All manufacturing and shipping times mentioned are just estimates and will vary.
- Some of our popular designs may be pre-printed and may ship out faster than less commonly ordered designs/style/color combinations.
- Our shirts are made when ordered. Due to the time variability of on-demand manufacturing, we offer 2 options for how quickly you want to receive your order. You can select from the following choices in checkout.

Rice Cookers
The Army Painter / Gf9
Storage Coffee Tables
Small Appliance Parts & Accessories
Specialised Cutlery



Safety Goggles
Szivattyúk És Kiegészítők
Sel Bundles
Volkswagen
Referee Gear